Drywall Lift BASS Polska BP-3401
Code: BP-3401Manufacturer-
Why is a Drywall Lift needed?
Who wouldn't need an extra pair of hands? Until the discovery of drywall lifts, installation was considered hard work, and it was impossible to manage without an assistant.
Now, a drywall lifter is affordable and accessible even for construction and repair works on a tight budget. However, not all drywall lifts are the same, even if they look identical.
Drywall Lift BASS Polska BP-3401. How is it different?
Firstly, it's one of the first lifts to appear on the Lithuanian market, which we have been offering to our clients since 2012. Over the years, its construction has undergone many changes – from more precise frame geometry, brakes, levers to additional handles for easier manipulation and positioning of the boards.
The lifter works with panels up to 68kg and has a fall protection. Designed for work at different angles, it has special handles for easier positioning of the panels.
The construction consists of three main parts:
- Legs with three wheels. For easier storage, this part is foldable and takes up little space. The wheels have brakes, also equipped with additional motion locking.
- Lifting mechanism with an emergency brake. To avoid dropping the panel when releasing the pad, you need to hold the emergency brake with another hand.
- Top swivel pad with adjustable length. Can be adjusted according to the panel's length.

How to use?
- Firstly, before using the drywall lift, check if the cable has no visible defects.
- Extend the legs with wheels and install the lifting mechanism. Important! Be sure to fully extend the lift arm before you start, do not start in the transport position!
- Position the swivel pad and align it according to the drywall sheet.
- Move the lift to the installation site. Release the lift, set the swivel pad vertically, load the drywall sheet and return it to the vertical position.
- Lift the sheet, if necessary, rotate the construction using special handles.

Technical specifications:
Maximum vertical projection
350 cm
Minimum vertical projection
140 cm
Minimum working stand size
91 x 128 cm
Maximum working stand size
91 x 290 cm
Maximum panel dimensions
128 x 488 cm
Maximum panel weight
68 kg
Drywall lift weight
48 kg
Assembled lift dimensions
130 x 60 x 19 cm
Number of wheels
3
-





















